  • Aluminum Composite Panel Production Line
  • LSFH1600 Aluminum Composite Panel
  • Specification of LSFH1600 Aluminum Composite Panel Production Line
  • Aluminum Coil Coating Line
  • LTZ1600 Aluminum Coil Coating Line
  • Flowchart of LTZ1600 Coil Coating Production Line
  • Specification of LTZ1600 Aluminum Coil Coating Line
  • Steel Coating Production Line
  • SCL1250 Steel Coating Production Line
  • Flowchart of SCL1250 Steel Coating Production Line
  • Specification of SCL1250 Steel Coating Production Line
  • Hot-Dip Galvanizing line
  • CGL1250 Hot-Dip Galvanizing Production line
  • Flowchart of CGL1250 Hot-Dip Galvanizing Production line
  • Specification of CGL1250 Hot-Dip Galvanizing Production Line
  • Metal Ceiling Production Line
  • Metal Ceiling Production Line
  • Characteristics of Metal Ceiling Production Line
  • Specification of Metal Ceiling Production Line
Contact us
Home » Products » Hot-Dip Galvanizing line »

Specification of CGL1250 Hot-Dip Galvanizing Production Line

Hot-Dip Galvanizing Line

1. Moving car for steel coil
Rail moving car is used for material on or off loading, driven by motor reducer speed, lifting up and down is finished by hydraulic system. Moving position inspector and controller of the car is available when it is running.
2. Unwinder
After unloaded by car, raw coils are sent to expansion drum to tension to be tight, and feeding material when the drum is rotating.
3. Pinching transmitter
To pinch steel strip while on or off loading, bottom rollers are driven by motor reducer of speed, with pneumatically pressed down structure of upper rollers.
4. Shear
For easy control and operation, and to reduce coil changing time, every uncoiler has its own shear, and every shear adopts double decker, pressed down hydraulically. Specially, shear operation has interlocked with whole line control. Shear also contains scrap guiding table and scrap car.
5. Welting machine
Connect the head and end of steel strips to ensure continuous production.
6. Deflective setting
To deflect the direction of strip.
7. Accumulating unit
To accumulate strips, the volume should ensure 2-2.5 min of line running, especially, maintain continuous production when changing coil.
8. Cleaning unit
The pre-treatment units make up of roller brusher, pump, spray nozzle, containing three processing sections: 3 steps for alkali cleaning, 3 times of roller brushing and 3 times of water cleaning.
9. Air blowing unit
To blow water film to be dried by hot air, the step is after water cleaning and water cooling.
10. Tension measuring roller
To measure tension inside the annealing furnace, make up of 3 deflective rollers, among these three, one roller can show tension results with pressure inspection.
11. Annealing furnace
To dismiss rolling stress, improve mechanical performance inside annealing furnace and raise heat of strip to certain temperature; clean surface of strip; micro- oxide film on strip surface is deoxidized to pure ferric layer by hydrogen in the furnace, preparing an adhesive surface for coating; also to control strip temperature precisely while entering into zinc pot through fast or slow cooling; keep or improve strip shape.
12. Galvanizing pot
To melt zinc ingot, and to realize zinc coating of strip.
13. Air blade
To adjust zinc thickness of strip surface through air blowing.
14. Cooling tower
To cool steel strip from zinc pot naturally or forcedly, ensuring zinc layer of newly coated strip has already been solidified when reach the first deflective roller.
15. Cooling and drying
To cool the strip by circulation water, and then press it.
16. Tension leveler
To haul the strip to be tight and straight.
17. Skin pass mill
To press spangle to be flat, improve smoothness of the surface, avoid and eliminate any bending or slip line during pinching and hauling. Improve plate form and straightness.
18. Chromizing chamber
To passivate the strip surface after zinc coating.
19. Hot air dry
Dry water film on strip surface after passivation.
20. Oil coater
To protect strip surface by oil coating.
21. Protection unit
To supply nitrogen and hydrogen for annealing furnace. There are three pumps, two for using and one for reserving.
22. Winder
Wind up the final strip to coil, convenient for storing and transportation.
pdfSpecification of CGL1250 Hot-dip Galvanizing Line

Related products
  • Hot-Dip Galvanizing Line
  • CGL1250 Hot-Dip Galvanizing LineSCL1250 Steel Color Coating Production Line
    Hot-dip galvanization (CGL) is used to dip the raw metal after surface pretreating into liquid metal or alloy with low melting point, during the process, the metal could get a protective layer, especially, the coated layer can be formed between galvanizing metal and basic metal. The raw metal is always ...
    pdfCGL1250 Hot-Dip Galvanizing Line
Home » Products » Hot-Dip Galvanizing line » Specification of CGL1250 Hot-Dip Galvanizing Production Line
Sitemap | Home | Aluminum Composite Panel Production Line | Aluminum Coil Coating Line | Steel Coating Production Line | Hot-Dip Galvanizing line | Contact us
ETW International